国模欢欢炮交啪啪150-日韩大片高清播放器-aⅴ一区二区三区无卡无码-国产69精品久久久久久妇女迅雷-天天做天天爱夜夜爽女人爽

上海松夏減震器有限公司是一家專業(yè)生產(chǎn)橡膠接頭、橡膠軟接頭、橡膠軟連接、橡膠伸縮器等系列的廠家,我們致力于為客戶解決管道連接問題,廠家直銷,值得信賴.
24小時(shí)咨詢熱線

17317317121

您現(xiàn)在所在位置:橡膠接頭廠家 > 技術(shù)支持 > 常見問題 >

安裝橡膠接頭之前,應(yīng)該做好哪方面的準(zhǔn)備工作?

   安裝橡膠接頭之前,應(yīng)該做好哪方面的準(zhǔn)備工作?今天上海松夏的小編就為大家介紹一下:

   What should be done before installing the rubber joint?Today, the small series of Shanghai songxia will introduce to you:

安裝橡膠接頭之前,應(yīng)該做好哪方面的準(zhǔn)備工作?

   在地下安裝可曲撓橡膠接頭需求加裝地埋裝置,可以更好的起到盡量照顧橡膠軟聯(lián)接的作用。管道安裝前可根據(jù)管道直徑及種類、溝槽物質(zhì)情形、動(dòng)工場(chǎng)地周圍環(huán)境與動(dòng)工機(jī)具等物質(zhì)情形進(jìn)行統(tǒng)籌,一樣來(lái)說(shuō),應(yīng)覺得合適而運(yùn)用交通工具式或履帶式吊車下管,當(dāng)溝旁道路狹窄,周圍樹木,電線桿較多,管徑較小時(shí),可用人工下管。

   The installation of flexible rubber joints underground requires the installation of a buried device, which can better take care of the role of soft rubber joints.According to pipe diameter and pipe before installation type, groove material situation, construction site environment and construction machinery, such as material situation to plan as a whole, the same, should see fit and use transportation type or crawler crane tube, when the ditch beside the road, narrow around trees, utility poles, pipe diameter is small, can be used under the artificial tube.

安裝橡膠接頭

   下管方式有集中下管、分散下管、組合吊裝。管道下溝前,應(yīng)將管溝內(nèi)塌方土、石塊、雨水、油污和積雪等.干凈;應(yīng)檢查溝或涵洞深度、標(biāo)高和斷面尺寸,并應(yīng)符合預(yù)設(shè)要求;石方工程段管溝,散松軟和墊厚度不能低于300mm,溝底應(yīng)沒有凹凸、五十塊。

   The lower pipe has centralized lower pipe, decentralized lower pipe and combined hoisting.Before the pipe trench, the trench should be collapsed in soil, stones, rain, oil and snow, etc.The trench or culvert depth, elevation and section size should be checked and meet the preset requirements;The ditch in the stone section should be loose and not less than 300mm thick. The ditch bottom should be free from bump and 50 pieces.

   溝邊組隊(duì)焊接就是將幾根管道在溝旁的地面上組隊(duì)焊接,一樣覺得合適而運(yùn)用波動(dòng)焊接,焊成管段再仆人地溝。此方法易擔(dān)保,操作方便,出產(chǎn)效率高。管段長(zhǎng)度由管徑大小及下管方法而定,不可以過長(zhǎng)而造成移動(dòng)困難,也不可以下管時(shí)管段彎曲過大而損傷管道與防腐層,沒管段以30~40m長(zhǎng)為宜。由于煤木焦油滋漆遮蓋層防腐的鋼管不準(zhǔn)許滾動(dòng)焊接,所以,只能將每根鋼管放在溝內(nèi)覺得合適而運(yùn)用固定焊。在管道鋼管進(jìn)行安裝焊接后,橡膠軟連接根據(jù)實(shí)際環(huán)境的不同進(jìn)行單個(gè)安裝。
   Gully edge group welding is several pipes in the gully side of the ground group welding, the same feel appropriate and the use of wave welding, welding into the pipe and then servants trench.This method is easy to guarantee, easy to operate and high efficiency.The length of the pipe segment is determined by the diameter of the pipe and the way to lower the pipe. It is not allowed to be too long and cause difficulty in moving, or to bend the pipe segment too much and damage the pipe and anticorrosive layer when the pipe segment is below. It is advisable to have a length of 30-40m without the pipe segment.Due to the coal tar coating coating anticorrosive steel pipe is not allowed to roll welding, so, can only put each steel pipe in the groove feel appropriate and the use of fixed welding.After the pipe is installed and welded, the rubber soft joint is installed individually according to the actual environment.
橡膠接頭

熱銷產(chǎn)品 了解更多+

上海松夏減震器有限公司

上海市寶山區(qū)園康路255號(hào)1號(hào)樓A區(qū)三層

17317317121

? Copyright 上海松夏減震器有限公司 All rights reserved XML HTML 滬ICP備09066468號(hào)-35

微信二維碼 微信二維碼
主站蜘蛛池模板: 精品国产三级a∨在线无码| 2019日韩中文字幕mv| 无码日韩精品国产av| av无码不卡一区二区三区| 天天爱天天做天天爽| 国产欧美日韩综合精品一区二区| 免费观看又色又爽又湿的软件| 国产精品久久久久久久久岛| 好紧好爽免费午夜视频| 亚洲色无码一区二区三区| 成人国产三级在线观看| 波多野结衣一区二区三区高清| 国产精品自产拍高潮在线观看| 性高湖久久久久久久久aaaaa| 99re热免费精品视频观看| 国产精品爆乳奶水无码视频免费| 亚洲国产欧美日韩另类| 国产成人av在线播放不卡| 国产 日韩 另类 视频一区| 999国内精品永久免费视频 | 狠狠躁夜夜躁人人爽蜜桃 | 色婷婷狠狠97成为人免费| 97人摸人人澡人人人超碰| 久99久精品免费视频热| 四虎国产精品永久地址入口| 精品aⅴ一区二区三区| 久久无码人妻热线精品| 久久婷婷色五月综合图区| 九九在线精品国产| 激情伊人五月天久久综合| 无遮掩无码h成人av动漫| 男女啪啪免费观看无遮挡| 99久久久无码国产精品9| 亚洲色在线v中文字幕| 末成年女av片一区二区丫| 日韩免费人妻av无码专区蜜桃| 国产在线午夜不卡精品影院| 久久www免费人成看片入口| 97久久久亚洲综合久久| 交换交换乱杂烩系列yy| 国产精品亚洲a∨天堂不卡|